top of page

Fresenius Medical Care

Dialyzer Fiber Lines 9 & 10

Ogden, Utah

 

Axis Architects designed and oversaw the construction of two fiber manufacturing lines for Fresenius Medical Care. As the major component of their dialysis filtration system, these fibers are produced in an ISO class 8 clean room environment. With an in-depth understanding of the manufacturing techniques and solid experience in clean room design, Axis was able to provide an expansion that streamlined the process and increased productivity.

 

 

Client: Fresenius Medical Care

Size: 12,000 SF

Cost: $20,000,000

Completion: 2008

 

 

bottom of page